Project Description

Chipstead Lane, Sevenoaks, Kent

MFS delivered the build of a bespoke private dwelling at Riverhead, Sevenoaks. Our works included the H+H Celcon thin joint blockwork, face brickwork, timber 1st floors, steelwork and craneage, the roof construction and cavity wall insulation. Our works took 6 weeks on site to complete the superstructure.

Green Housing

‘A’
Rated

Construction at a glance:

Location: Sevenoaks, Kent
Client: Private Client
Build TypeResidential Low Rise
No of Units: 1 House
Status: Project Completed in May 2011.
Build Duration: 6 weeks on site
MFS System: H+H Celcon Thin Joint Blockwork

Additional build requirements:

  • Brickwork
  • Structural Steelwork
  • Timber floors
  • Cut & Pitch roof
Contact us
Chipstead Masonry Frame System ConstructionChipstead Masonry Frame System Construction

Construction Image Gallery

H+H Celcon Thin Joint Blockwork
H+H Celcon Thin Joint Factsheet

Contact Masonry Frame Systems

Please tick this box if you would like to be kept up to date with our latest news and projects, you can unsubscribe at any time.

We’d love to discuss your construction project with you, please get in touch with us.

Connect with MFS