Project Description

Gales Place, Crawley, West Sussex

13 new homes and Crawley Borough Council’s first Passivhaus Project. The unique type of build, which was first developed in the early 1990s in Germany, focuses on enhancing energy efficiency with excellent thermal performance, exceptional airtightness and mechanical ventilation. Passivhaus builds have no draughts, with fresh air being continuously provided by mechanical ventilation. This provides high air quality while reducing condensation.

The homes are so thermally efficient that only minimal heating is required to maintain comfortable temperatures all year round.

Green Housing

‘A’
Rated and Award Winning Passivhaus

Construction at a glance:

Location: Gales Place, Three Bridges, Crawley, West Sussex
Client: Westridge Construction Ltd for Crawley Borough Council. Designed by the Tooley & Foster Partnership, using their in house accredited Passivhaus Design Architect
Build TypeResidential Med/High Rise
No of Units: 13 new homes over 3 blocks. 6 flats and 7 houses all to Passivhaus standard
Status: Project Completed in September 2016
Build Duration: 16 weeks on site
MFS System: H+H Celcon Thin Joint Blockwork

Additional build requirements:

  • Structural steel work
  • Precast concrete floor planks and stairs to the flats
  • 300mm thick cavity wall Insulation
  • ‘I’ Joists
  • Roof trusses
  • Brickwork
Contact us
Gales Place Masonry Frame SystemsGales Place Masonry Frame Systems

Project Details

H+H Celcon Thin Joint Blockwork
H+H Celcon Thin Joint Factsheet

The project in Gales Place aimed to provide affordable homes within the development of six flats and seven houses all built to the internationally recognised Passivhaus standards, designed by by the Tooley & Foster Partnership, using their in house accredited Passivhaus Design Architect.

Cabinet member for Housing at Crawley Borough Council, Councillor Stephen Joyce, said: “This continues to be an exciting development for us as we see each stage of the project coming together. Not only are we providing much-needed council housing for the town but by investing in the Passivhaus system we’re reducing fuel bills for our tenants. I am thoroughly looking forward to seeing the finished result.”

Continuing this, Director for Westridge Construction Ltd, Martin Buckthorpe said: “The project is going very well and Westridge are excited to reach weather tightness two weeks early.”

All the properties were built using the H+H Celcon thin joint system, with 100mm blocks, 7N and 3.6N. MFS carried out all the masonry works, including the face brickwork, thin joint blockwork, 300mm cavity wall insulation, lintels, steelwork, pcc concrete floors and staircases (to the flats), engineered timber ‘I’ joists and plywood decking to the houses and the roof constructions including all craneage.

Construction Achievements:

0 weeks
less time on site
0%
Reduction in Labour
0%
Less waste on site
0K
Overall build saving

Key Performance Indicators

Timescale

  • 8 weeks in Dfma

  • 16 weeks on site

Savings

  • 6 weeks less time on site than a traditional build

  • 50% less labour required

  • 50% less waste on site

  • Occupation 6 weeks earlier than a traditional build

Performance

  • Passivhaus standard

  • Fire resistant: Excellent 4hrs+

  • Acoustic: Excellent

  • Thermal: Good

  • Green Credentials: AA rated

Compliance

  • Design Warranty

  • Part E & Part L Building regs

“The project went very well and Westridge were excited to reach weather tightness two weeks early.”

Martin Buckthorpe, Director for Westridge Construction Ltd

Construction Image Gallery

Contact Masonry Frame Systems

Please tick this box if you would like to be kept up to date with our latest news and projects, you can unsubscribe at any time.

We’d love to discuss your construction project with you, please get in touch with us.

Connect with MFS