Project Description

Longfield, Kent

MFS were awarded the above contract to build 27 units (24 flats and 3 bungalows) for property developer Gray’s Thurrock Properties Limited. Our contract period was 12 weeks; we took our build from oversite slab to roof construction.

Green Housing

‘A’
Rated

Construction at a glance:

Location: Longfield, Kent.
Client: Gray’s Thurrock Properties Limited
Build TypeResidential Low Rise
No of Units: 27 units, 24 flats and 3 bungalows
Status: Project completed in November 2011.
Build Duration: 12 weeks on site
MFS System: H+H Celcon Thin Joint Blockwork

Additional build requirements:

  • Precast concrete floor planks & stairs
  • Roof trusses
Contact us
Longfield MFS ConstructionLongfield MFS Construction

Project Details

H+H Celcon Thin Joint Blockwork
H+H Celcon Thin Joint Factsheet

The 1st floors of the flats (blocks 2 -5) were installed by Milbank Floors on our behalf. All units were built from Celcon aircrete blocks in thin joint, both inner and outer skins. The external elevations being rendered.

Construction Achievements:

0 weeks
less time on site
0%
Reduction in Labour
0%
Less waste on site
0K
Overall build saving

Key Performance Indicators

Timescale

  • 12 weeks on site

Savings

  • 10 weeks less time on site than a traditional build

  • 50% less labour required

  • Over £120k in overall build spend

  • 70% less waste on site

  • Occupation 10 weeks earlier than a traditional build

Performance

  • Fire resistant: Excellent 4hrs+

  • Acoustic: Excellent

  • Thermal: Good

  • Green Credentials: A rated

Compliance

  • Design Warranty

  • Part E & Part L Building regs

Construction Image Gallery

Contact Masonry Frame Systems

Please tick this box if you would like to be kept up to date with our latest news and projects, you can unsubscribe at any time.

We’d love to discuss your construction project with you, please get in touch with us.

Connect with MFS