Project Description

St Faiths Vicarage, Dulwich, London

MFS were awarded the contract to carry out the Thin Joint Block work to the new Vicarage which was built adjacent to the existing church building. The project was engaged by The Diocese of Southwark, with Ash Contracting Ltd as the main Contractor. Our work in Dulwich started in November 2016. The entire project was completed in May 2017.

Green Housing

‘Low’
Energy

Construction at a glance:

Location: North Dulwich in South East London
ClientThe Diocese of Southwark, with Ash Contracting Ltd from Ryarsh, Kent
The Architects were Frankham Consulting, Haywards Heath
Build TypeResidential Low Rise
No of Units: 5 bedroom residential property
Status: Project Completed in January 2017.
Build Duration: 6 weeks on site.
MFS System: Xella Silka Element System,
Xella Ytong Thin Joint blockwork,
H&H Celcon Thin Joint blockwork

Additional build requirements:

  • Precast concrete floor planks
  • Brickwork
St Faiths Vicarage Construction MFSSt Faiths Vicarage Construction MFS

Project Details

On this job we were using both Celcon and Xella blocks. The Architects were Frankham Consulting, Haywards Heath office who specified a solid external wall of 215mm thick Xella Aircrete Ytong block laid thin joint, with Celcon Thin Joint Blockwork to the 8.7N internal 140mm walls.

The external walls have been finished with a render and a brick slip system. The ground, 1st and 2nd floors were all installed by Charcon Concrete Products Ltd.

Construction Image Gallery

Contact Masonry Frame Systems

Please tick this box if you would like to be kept up to date with our latest news and projects, you can unsubscribe at any time.

We’d love to discuss your construction project with you, please get in touch with us.

Connect with MFS