Project: Tonbridge Extra Care Housing

Our experience working with MFS has been really positive. We will definitely consider using them again having been impressed by the Silka Elements system, their way of working, and the service in general.

They ably dealt with the late introduction of a gas membrane, due to an enforced design change. They adapted their schedule and worked with Jenner to resolve the situation, showing their flexibility and willingness to do whatever was necessary to keep to schedule. They were also very good at answering our questions and giving us assurances throughout the process and delivered both on time, and on budget.

We also valued the fact that the Silka Elements building system helped give an impressive example of a clean and efficient site. The significant reduction in waste and dust on site, along with the aesthetics of the blocks was really quite impactful compared to a traditional build, and numerous  visitors commented on this.

Oliver Garsed-Bennet, The Abbeyfield Kent Society

Chantry Hall, Westbourne MFS Cosntruction

Project: Chantry House

We were pleased with the Rå Build approach because having the one shell contractor simplified the process for getting the site underway within agreed time frames. The speed of build is remarkable and in fact the watertight shells were ready so quickly we had to be alert to keep up. We found the Thin-Joint walls provide a very solid and true base for following trades.

Adrian Rolt, Telegraph Construction Management Ltd

Ashford Homes H+H Celcon Jumbo Bloks

Project: Ashford 44

We wanted to go with an all masonry solution for several reasons. We wanted a really robust solution to help with our longer-term planned maintenance programme and feel that masonry provides us with the reassurance of a really solid structure. We also considered that airtightness that the Rå Build method offers, particularly the assurance that this level of airtightness will be maintained over time. The masonry solution also gave us the flexibility to include bespoke designs – which is key to the success of this project, given the nature of the sites we were developing.

Giles Holloway , Ashford Borough Council

Project: 334 London Road

I am truly astounded by the progress at my latest project. Using the Silka system just a few men have built the internal and external walls complete with face brickwork for two flats in just 3 weeks. The efficiency of MFS should have 9 flats over 5 floors completed on target in 14 weeks.

Brian Sheridan, Director at Westmount Square Ltd

Project: Ampersand Apartments

We’ve got the best solution and best people to deliver it.

Jaymie Kelly, QS at PDR Construction

Eastbourne College MFS Construction

Project: Eastbourne College

MFS took over our Silka works on our Eastbourne College project after problems with our Belgian contractor.

Being an experienced thin bed contractor, MFS got to grips with the intricacies of the system including the critical sequencing of the build to access the works with the material handler. MFS invested in further training of their operatives in the system and equipment including material handling which was a grey area regards CPCS certification. There were some sequencing delays by other trades… but MFS proved to be flexible in accommodating.

Mike Rosier , Vinci Construction UK Ltd

Pinefields Ra House Construction MFS

Project: Pinefields

The choice of the H+H Celcon Thin Joint Aircrete block work system throughout the build was one of the key Design decisions in our solution to achieve Level 3 of the Code; and with the build contract undertaken by Masonry Frame Systems, it proved to be a wise decision.

Johan Leibenberg , Wates Living Space Ltd

Gales Place Masonry Frame Systems

Project: Gales Place

The project went very well and Westridge were excited to reach weather tightness two weeks early.

Martin Buckthorpe, Director for Westridge Construction Ltd

Partner Testimonials

Ashford Homes H+H Celcon Jumbo Bloks

Project: Ashford 44 

With 44 units including 18 apartments on eleven separate sites, all with different dwelling types, Rå Build, using Thin Joint technology, provided a simple approach at design stage, plus vital programme flexibility on site. The large format blocks and thin layer mortar are ex stock, and simply called off as required, making delivery and storage of blocks a straightforward issue for the contractor. As an H+H Recommended ContractorH+H Celcon provided all masonry frames across eleven separate sites the programme control was greatly simplified.

Graham Keenor, H+H Celcon

Oyster Reach Passivhaus Construction

Project: Oyster Reach

It’s always nice to see H+H products and solutions being used with sustainability at the forefront. Oyster Reach is a beautiful development and is unique in its approach to the environment. The Thin-Joint System is easy to use and promotes the use of larger blocks, such as Jumbo Bloks, with 2mm joints rather than the traditional 10mm joint. This enables a building to be built faster whilst reducing cost and waste on site.

John Churchett, H+H Celcon

Contact Masonry Frame Systems

Please tick this box if you would like to be kept up to date with our latest news and projects, you can unsubscribe at any time.

We’d love to discuss your construction project with you, please get in touch with us.

Connect with MFS