Independent industry experts recently concluded that the MFS i-Form Solution™ is quicker, cheaper and uses significantly less labour than traditional RC Frame construction.

We were asked to be part of a Cost / Benefit analysis conducted by a leading UK Developer & Main Contractor and two top London QS practices. They were tasked with evaluating and comparing various MMC solutions for post-Covid procurement and had targeted the MFS i-Form Solution™ to be part of the study, comparing it directly with a conventional RC Frame build.

A number of exercises were undertaken with both ‘real’ world and ‘simulation’ models. They concluded that the MFS i-Form Solution™ was both substantially quicker and at least 20% cheaper than RC Frame and Metsec infill and used less than 25% of the expected workforce. This was particularly pertinent for a Covid-secure construction site, where social distancing and maintaining productivity levels are continuing to prove extremely challenging.

In fact in one exercise, based on a real life 630-unit high rise apartment scheme, which was estimated should take c. 54-56 working weeks to complete; they had an average of 130 site based operatives on site for the duration of the structural build programme. They concluded that the MFS i-Form Solution™ would reduce that estimate to just 46 weeks, with typically only 25-30 operatives on site.

The study group was also impressed by the excellent fire, acoustic and environmental credentials of the system and are recommending the system to their procurement personnel and groups as a viable and cost effective MMC option for the future.