Project Description

Weedon Lane, Amersham

MFS were appointed to construct the frame of the 4800sq ft dwelling, in a contract period of 5 weeks. Our works included the sub structure brick and blockwork, the design, supply and installation of the beam and block ground floor slab, the inner blockwork leaf, internal partitions, the 1st floor construction using TJI engineered joists and the erection of the roof using trusses, covered with felt to leave a water tight shell ready for fitting out.

Green Housing

‘A’
Rated

Construction at a glance:

Location: Amersham in Buckinghamshire
Client: Private Client
Build TypeResidential Low Rise
No of Units: Single house over 4,800 sq ft
Status: Completed Project.
Build Duration: Completed 2006, 5 weeks on site.
MFS System: H+H Celcon Thin Joint Blockwork

Additional build requirements:

  • Beam and block floors
  • ‘I’ Joists
  • Roof trusses
  • Felt & Fly Batten
Contact us
Weedon Lane MFS ConstructionWeedon Lane MFS Construction

Construction Image Gallery

H+H Celcon Thin Joint Blockwork
H+H Celcon Thin Joint Factsheet

Contact Masonry Frame Systems

Please tick this box if you would like to be kept up to date with our latest news and projects, you can unsubscribe at any time.

We’d love to discuss your construction project with you, please get in touch with us.

Connect with MFS