Project Description

344 London Road

MFS were appointed by Westmount Square Ltd to construct nine apartments over five storeys at 344 London Road in Croydon using the MFS i-Form Solution™, our P-DfMA approach to MMC. This project represents another milestone for MFS as they have taken total Design Responsibility for the Structural Design.

Green Housing

‘A’
Rated

Construction at a glance:

Location: East Croydon, S London
Client: Westmount Square Ltd
Build TypeResidential Medium to High Rise
No of Units: Nine apartments, over 5 storeys
Status: Completed
Build Duration: 14 weeks on site
System: MFS i-Form Solution™

Construction Platforms:

  • Xella Silka large format blocks
  • Loose Structural steel work
  • PreCast Concrete Hollowcore floor planks
  • Address Class 2B Disproportionate Collapse
  • PreCast Concrete Stairs & balconies
Contact us

Project Details

Xella Ytong System
Xella Ytong Factsheet

Delivering the complete structural envelopes of nine luxury apartments over five storeys using the MFS i-Form Solution™ this project represents another milestone for MFS as they have taken total Design Responsibility for the Structural Design and have addressed all associated Class 2B Disproportionate Collapse works.

The combination of ‘platforms’ included large format Silka Elements, PCC hollowcore floors, balconies and other construction components. MFS are proud to bring their own PDfMA approach to market and see massive opportunity in the ‘medium to high’ rise residential sector.

Work started on site with the arrival of our 2 welfare units and storage containers from R.S.French and also our Lissmac Mini-crane.

A 14 week construction period on site, saves our client 11 weeks in time and an estimated 12.70% on overall build costs.

Construction Achievements:

0 weeks
Less time on site
0%
Reduction in Labour
0%
Less waste on site
0%
Overall build saving

Key Performance Indicators

Timescale

  • 26 weeks in planning and design

  • 12 weeks in Dfma

  • 14 weeks on site

Savings

  • No up-front payments

  • 11 weeks less time on site than a traditional build

  • 50% less labour required

  • No internal scaffolding

  • Over £400k in overall build spend

  • 100% less waste on site

  • Occupation 9 weeks earlier than a traditional build

Performance

  • Fire resistant: Excellent 4hrs+

  • Acoustic: Excellent

  • Thermal: Good

  • Green Credentials: A rated

Compliance

  • Design Warranty

  • Part E & Part L Building regs

  • Meets Approved Document A3 Disproportionate Collapse Class 2A & 2B

  • BIM compliant

The Role of MFS

With a combination of construction ‘platforms’ including the Silka Element system, PCC floors, balconies and other components, together with their In House Design team, MFS are proud to bring their own PDfMA approach (trademarked as the i-Form Solution™) to market and see massive opportunity in the ‘medium to high’ rise residential sector.

MFS Design Innovations

Nine luxury apartments over five storeys using the MFS i-Form Solution™ utilising the primary platform of Xella Silka large format blocks, this project represents another milestone for MFS as they have taken total Design Responsibility for the Structural Design.

Client Testimonial

I am truly astounded by the progress at my latest project. Using the MFS i-Form Solution™ just a few men have built the internal and external walls complete with face brickwork for two flats in just 3 weeks. The efficiency of MFS should have 9 flats over 5 floors completed on target in 14 weeks.

Westmount SquareBrian Sheridan, Director at Westmount Square Ltd

Construction Image Gallery

Contact Masonry Frame Systems

    Please tick this box if you would like to be kept up to date with our latest news and projects, you can unsubscribe at any time.

    Find out how the MFS i-Form Solution™ could save time, labour & money on your next construction project, please get in touch.

    Book a CPD presentation for your team.

    Connect with MFS