MFS were awarded a large new regeneration project for Crest Nicholson Regeneration in Bath, Somerset. We built the complete structural envelope using the Xella Ytong Blockwork System for 24 new four storey, five bed homes at Blocks B1 and B2, Midland Road, as part of Crest’s 10 year Regeneration Project. Our contract period was 20 weeks and our contract value was £490k.

‘A’
Rated
Construction at a glance:
Location: Bath in Somerset
Client: Crest Nicholson Regeneration
Build Type: Residential Low Rise
No of Units: 24, four storey, five bed homes
Status: Completed Project.
Build Duration: 20 weeks on site.
MFS System: Xella Ytong System
Additional build requirements:
- Structural steel frame
- Eco joist floors for the houses
- Precast concrete floor planks & staircases for the apartments and commercial units
- A lift shaft
- Cut and pitched roofs
- Flat roof decking to the garage areas


Project Details
Crest Nicholson, approached us at MFS to carry out the masonry frame of Albert Crescent. We used the Xella Ytong blockwork system for the project. Xella being Crest’s preferred block supplier. By using our Masonry Frame System the inner leaves were taken up first, with the bath stone block cladding following on behind.
The construction included structural steelwork, engineered eco joist floors (for the houses), pre cast concrete floors and staircases (for the apartment’s and commercial units), a lift shaft, cut and pitched roofs and flat roof decking to the garage areas.
Construction Achievements:
Key Performance Indicators

Timescale

Savings

Performance

Compliance