Ashford 44 council houses
Changes to government funding structures for social housing allow Councils, for the first time in nearly thirty years, to build directly owned houses for rent. Capitalising on these changes, Ashford Council embarked on a programme of building adding to the council owned portfolio, using private sector finance to fund the development.
MFS were asked to design and build 44 brand new council houses. The development comprised a range of dwellings including: bungalows, semi-detached and attached houses. In addition there were some apartments and a care unit for elderly residents.

Code for Sustainable
Homes Level 4
Construction at a glance:
Location: Ashford in Kent
Client: ISG Jackson, Ashford Borough Council
Build Type: Residential Low Rise and Care Homes
No of Units: 44 houses over 11 sites
Status: Completed Project.
Build Duration: Completed October 2011, 21 weeks on various sites in Ashford.
MFS System: H+H Celcon Thin Joint Blocks
Additional build requirements:
- Structural steel frame
- Precast concrete floor planks
- ‘I’Joists
- Roof trusses
- Cavity wall insulation
- Brickwork & Monocouche render


Project Details
MFS were able to take full advantage of our thin joint block system and carried out all the structural envelope construction including:
- Internal and external block work leaves
- Intermediate and PCC separating floors
- Trussed roof construction
The 44 units were delivered within a 21 week programme with four sites under construction at any one time. The builds were carried out in 11 different sites throughout Kent.

Client Testimonial
With 44 units including 18 apartments on eleven separate sites, all with different dwelling types, Rå Build, using Thin Joint technology, provided a simple approach at design stage, plus vital programme flexibility on site. The large format blocks and thin layer mortar are ex stock, and simply called off as required, making delivery and storage of blocks a straightforward issue for the contractor. As an H+H Recommended Contractor provided all masonry frames across eleven separate sites the programme control was greatly simplified.

Client Testimonial
We wanted to go with an all masonry solution for several reasons. We wanted a really robust solution to help with our longer-term planned maintenance programme and feel that masonry provides us with the reassurance of a really solid structure. We also considered that airtightness that the Rå Build method offers, particularly the assurance that this level of airtightness will be maintained over time. The masonry solution also gave us the flexibility to include bespoke designs – which is key to the success of this project, given the nature of the sites we were developing.