Project Description
Longfield, Kent
MFS were awarded the above contract to build 27 units (24 flats and 3 bungalows) for property developer Gray’s Thurrock Properties Limited. Our contract period was 12 weeks; we took our build from oversite slab to roof construction.
‘A’
Rated
Construction at a glance:
Location: Longfield, Kent.
Client: Gray’s Thurrock Properties Limited
Build Type: Residential Low Rise
No of Units: 27 units, 24 flats and 3 bungalows
Status: Project completed in November 2011.
Build Duration: 12 weeks on site
MFS System: H+H Celcon Thin Joint Blockwork
Additional build requirements:
- Precast concrete floor planks & stairs
- Roof trusses
Construction Achievements:
Key Performance Indicators
Timescale
12 weeks on site
Savings
10 weeks less time on site than a traditional build
50% less labour required
Over £120k in overall build spend
70% less waste on site
Occupation 10 weeks earlier than a traditional build
Performance
Fire resistant: Excellent 4hrs+
Acoustic: Excellent
Thermal: Good
Green Credentials: A rated
Compliance
Design Warranty
Part E & Part L Building regs